Protection and automation system, dispatching and scada systems include:
The National Iranian Copper Industries Company (Sarcheshmeh Copper Complex) aims to provide reliable and needed electricity for development projects, renovation of equipment, maintaining production, developing new capacities and existing capacity in the transmission and distribution network of the complex, in 2012 The contract was signed with "EID" for 5 years.
The projects carried out are as follows.
Protection and automation system, dispatching and scada systems include:
Development, Replacement, Capacity Increase for mine substation Switch Boxes and medium voltage switchgear
This project is intended to development 20kV power grid projects for supply the projects under construction. New Acid Factory, New Oxygen Plant, New Flotation Hall, Molybdenum, and Press Filter.
Construction of 230/20kV substation of Darezar
Replacing and increasing the capacity of the rectifier transformers in the refinery which are very important in the production line, but due to its high functionality and the results of insulation lifetime tests that indicate an aging insulation that can interfere with their continuous operation in the production line. They must be replaced before emergencies.
Replacing and Developing 400 V Switches
Replacement of medium voltage circuit breakers
Designing the lighting system with use of new energies, Replacing Low Energy Lighting Systems ,Installation 18 LED lights 240 W at the mine,Installation 2 LED light 96W on Mining machine
Creating a monitoring system for engines, generators and switches
Construction of a Central Electric power dispatching Building
Construction of a two feeder 132kV return water substation
Construction of the 230kV AIS switchgear located in the Darehzar
132/20 kV return water
Installation and commissioning of the central measurement system and reading of power consumption of residential, office and commercial units of Sarcheshmeh Copper City
Modification and optimization of the oxygen substation